Up CPDay / Greenwich » north wing Prev Next Slideshow

Photos are in reverse chronological order (newest at beginning / oldest at end)
Page | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |

DSC_9402
121
A check with the plans.
5/11/12 11:00 AM
1071x1600 (970kB)
DSC_9394
122
The old roof shingles are stripped.
5/11/12 10:53 AM
1600x1071 (533kB)
DSC_9389
123
The old roof shingles are stripped.
5/11/12 10:52 AM
1600x1071 (738kB)
DSC_9388
124
A scaffold is constructed for the exterior work.
5/11/12 10:07 AM
1600x1071 (785kB)
DSC_9385
125
A scaffold is constructed for the exterior work.
5/11/12 9:50 AM
1600x1071 (995kB)
DSC_9382
126
The Azek trim is added to the larger side window.
5/11/12 9:11 AM
1600x1071 (742kB)
DSC_9370
127
Details of the tray framing get filled in.
5/10/12 5:11 PM
1600x1071 (589kB)
DSC_9368
128
The larger side window looks much better in it's new location.
5/10/12 5:10 PM
1600x1071 (641kB)
DSC_9362
DSC_9361
DSC_9357
DSC_9354
132
The bedroom coffers get preliminary framing.
5/9/12 4:50 PM
1600x1071 (621kB)
DSC_9350
DSC_9335
134
Right closet, linen closet and bath.
5/8/12 4:46 PM
1600x1071 (470kB)
DSC_9325
135
Framing for coffered ceiling starts to take shape (5).
5/8/12 4:44 PM
1600x1071 (705kB)
DSC_9321
136
Linen closet area.
5/8/12 4:42 PM
1600x1071 (508kB)
DSC_9320
137
Linen closet area.
5/8/12 4:40 PM
1071x1600 (508kB)
DSC_9315
138
5/8/12 4:37 PM
1600x1071 (594kB)
DSC_9314
DSC_9312
140
Framing for coffered ceiling starts to take shape (4).
5/8/12 4:35 PM
1600x1071 (559kB)

Page | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
Total images: 175 | Last update: 10/19/12 2:26 PM | Go to CPDay pages | Create web photo albums with Jalbum | Chameleon skin | Help