CPDay / Greenwich
» north wing
Photos are in reverse chronological order (newest at beginning / oldest at end)
Page |
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
61
The framing inspector came by today and signed off. Now we're ready to insulate.
6/19/12 2:39 PM
1071x1600 (814kB)
62
The oval window has the right proportions now and gets its own copper flashing. The top keystone helps, too.
6/19/12 9:02 AM
1600x1071 (514kB)
63
The coppersmith team is back. They are putting the original copper gutters back over the new trim. Some new sections are being formed to fit the new, longer fascias.
6/19/12 9:01 AM
1600x1071 (925kB)
64
The copper window roof has been completed.
6/18/12 9:16 AM
1071x1600 (1.1MB)
65
The HVAC inspector arrived this morning. There was not much HVAC work to see. We passed and the inspection card was signed.
6/18/12 9:10 AM
1071x1600 (853kB)
66
That's WAY up there. This certainly saves a lot of challenging ladder work.
6/14/12 5:07 PM
1071x1600 (914kB)
67
The boom stretches out.
6/14/12 4:48 PM
1071x1600 (955kB)
68
It can peer over the cedar trees. This would be great for tree trimming.
6/14/12 4:49 PM
1600x1071 (1.0MB)
69
The boom in action.
6/14/12 2:43 PM
1071x1600 (886kB)
70
Now is probably a good time to read the instructions.
6/14/12 2:19 PM
1071x1600 (1.2MB)
71
The view from the passenger end of the boom.
6/15/12 6:33 AM
1600x1071 (1.1MB)
72
The rental boom (a Genie 60/34) appears to be brand new. The useage meter reads just 48.5 hours
6/14/12 1:48 PM
1600x1071 (1.2MB)
73
Did somebody say "we need a lift?" This is the very large boom rented for work on the West side. It has a 35 foot reach.
6/14/12 2:51 PM
1284x1650 (475kB)
74
The West side of the house is also getting the Azek treatment. The heights and the short ladder positioning spaces makes this challenging.
6/14/12 1:51 PM
1071x1600 (914kB)
75
The cedar clapboards need to be staggered around the window to avoid a visible vertical seam. A Dremel oscilating saw is used to make the cuts in the clapboard.
6/12/12 9:52 AM
1071x1600 (634kB)
76
Detail of the recessed corner trim. Much like the sketch.
6/12/12 9:56 AM
1600x1071 (702kB)
77
The real exterior inside corner, in progress. Most of the Azek is up. The resin-cast oval window trim is being mounted in place.
6/12/12 9:52 AM
1071x1600 (677kB)
78
The idea: Architect's sketch for the Azek trim on the exterior inside corner.
6/12/12 10:24 AM
1228x1600 (421kB)
79
The oval window looks a little more balanced at it's new elevation.
6/8/12 7:36 AM
1600x1071 (890kB)
80
Since the north wing is coming out so well, we are replacing more of the exterior trim with Azek. Much of the old trim was rotted.
6/8/12 7:33 AM
1600x1071 (758kB)
Page |
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
Total images:
175
| Last update:
10/19/12 2:26 PM
|
Go to CPDay pages
| Create
web photo albums
with
Jalbum
|
Chameleon
skin |
Help