Up CPDay / Greenwich II » general improvements Prev Next Slideshow

« | < | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 |

 Previous image  Next image  Index page  Original Image [DSC_2910.jpg - 609kB]
DSC_2910.jpg - The back stairway is waiting for me to install the hanging chandelier.  This will be a real challenge, as I will need to construct a temporary, special-design scaffold for this purpose.

 34 | The back stairway is waiting for me to install the hanging chandelier. This will be a real challenge, as I will need to construct a temporary, special-design scaffold for this purpose. | DSC_2910.jpg | 12/6/17 1:34 PM | 1600x1071px | 609kB Download Original Image
« | < | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 |
Camera: NIKON D80 | Date: 12/6/17 1:34 PM | ISO: 400 | Exp. Time: 1/80s | Aperture: 4.5 | Focal Length: 11.0mm (~16.8mm) | Copyright: © 2017 CPDay
Total images: 39 | Last update: 12/8/17 6:26 PM | Go to CPDay pages | Help