A concern has been how to move heavy exercise equipment to the finished portion of the basement. In particular, how do we replace part of the wool carpeting with heavy-duty gym tile flooring? Here, I've pulled back a corner of the carpet to reveal nail strips, padding and (what I believe is) a DRIcore™-type subfloor. My plan is to replace a section of carpet & padding with Swisstrax™ flooring.
10/23/17 12:44 PM
1600x1071 (703kB)
22
I have been averaging about one new ceiling light fixture installation per day. Today, Jayne's study (the former "Moon Room") is getting a new light. This is a typical procedure...
11/24/17 1:03 PM
1071x1600 (651kB)
23
I perch the fixture on top of one step ladder while standing on another one in order to connect the wires. I need to have the fixture within about 6 inches of the ceiling box
11/24/17 1:11 PM
1600x1071 (550kB)
24
Engage the mounting screws by raising the fixture up. Then, while holding the fixture up against the ceiling with one hand, I attach the nuts with my other two hands. Wait, that makes three hands... No wonder this is usually a two-person task.
11/24/17 1:49 PM
1600x1071 (601kB)
25
Yet another ceiling light fixture, this in the vestibule for Jayne's study. Many of these require that I also replace the wall switches to accomodate the LED lighting that I am using everywhere. The house was originally equipped with Lutron dimmers that were designed for more power-hungry incandescent and halogen lights.
11/24/17 8:04 PM
1071x1600 (495kB)
26
This is one of two new light fixtures I am installing in the master suite hallwy.
11/26/17 4:44 PM
1600x1071 (405kB)
27
Wall partitions are being framed in the room over the garage. This project was permitted, but not completed by the previous owners.
11/24/17 11:32 AM
1600x1071 (578kB)
28
To accomodate the new shower drain, plumber Darren and I cut into the garage ceiling.
11/28/17 12:16 PM
1071x1600 (439kB)
29
This releases an avalanche of poured insulation, which i tried, not very successfully, to catch in my green landscapers' barrel.
11/28/17 12:17 PM
1600x1071 (719kB)
30
Darren connected the shower drain line to the other fixtures' main drain pipe. More cut sheetrock and even more cascading insulation resulted.
11/28/17 4:12 PM
1600x1071 (433kB)
31
This is the full extent of the new drain line.
11/28/17 4:13 PM
1071x1600 (424kB)
32
Back upstairs in the bonus room, Darren has installed the PEX water supply lines and the drain for the shower. I have saved the loose insulation in the large bags. Reusing the insulation upstairs is just a matter pouring it back into the cavities.
12/6/17 1:32 PM
1600x1071 (743kB)
33
This is a closer look at the shower plumbing.
12/6/17 1:33 PM
1600x1071 (912kB)
34
The back stairway is waiting for me to install the hanging chandelier. This will be a real challenge, as I will need to construct a temporary, special-design scaffold for this purpose.
12/6/17 1:34 PM
1600x1071 (609kB)
35
Another day, and I'm installing yet another ceiling light fixture.
12/6/17 4:11 PM
1071x1600 (755kB)
36
Master suite hallway is finished!
12/7/17 7:42 AM
1071x1600 (533kB)
37
Next, I need to install hanging pendant lights in Jayne's closet. I start with the light over the island. I should be able to do these in my sleep by now, but each one presents its own challenges.
12/8/17 4:21 PM
1071x1600 (583kB)
38
After wiring it in, tucking the wires into the canopy and attaching the mounting nuts (always the trickiest part), I test the light.
12/8/17 4:50 PM
1071x1600 (609kB)
39
And today's new light fixture is done!
12/8/17 5:11 PM