Up CPDay / Greenwich II » general improvements Prev Next Slideshow

« | < | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 |

 Previous image  Next image  Index page  Original Image [DSC_2907.jpg - 743kB]
DSC_2907.jpg - Back upstairs in the bonus room, Darren has installed the PEX water supply lines and the drain for the shower.  I have saved the loose insulation in the large bags.  Reusing the insulation upstairs is just a matter pouring it back into the cavities.

 32 | Back upstairs in the bonus room, Darren has installed the PEX water supply lines and the drain for the shower. I have saved the loose insulation in the large bags. Reusing the insulation upstairs is just a matter pouring it back into the cavities. | DSC_2907.jpg | 12/6/17 1:32 PM | 1600x1071px | 743kB Download Original Image
« | < | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 |
Camera: NIKON D80 | Date: 12/6/17 1:32 PM | ISO: 400 | Exp. Time: 1/15s | Aperture: 5.6 | Focal Length: 19.0mm (~28.9mm) | Copyright: © 2017 CPDay
Total images: 39 | Last update: 12/8/17 6:26 PM | Go to CPDay pages | Help