Up CPDay / Greenwich » north wing Prev Next Slideshow

« | < | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | > | »

 Previous image  Next image  Index page  Original Image [DSC_9758.jpg - 802kB]
DSC_9758.jpg - That's a lot of framing and blocking in such a small part of the ceiling.  The fiberglass installers were working in 97 degree heat in the room.  It was easily 130 degrees in the attic space above the insulation, where they applied another layer.  I haven't installed a powered gable vent in this section yet, but I soon will.

 57 | That's a lot of framing and blocking in such a small part of the ceiling. The fiberglass installers were working in 97 degree heat in the room. It was easily 130 degrees in the attic space above the insulation, where they applied another layer. I haven't installed a powered gable vent in this section yet, but I soon will. | DSC_9758.jpg | 6/20/12 3:07 PM | 1600x1071px | 802kB Download Original Image
« | < | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | > | »
Camera: NIKON D80 | Date: 6/20/12 3:07 PM | ISO: 800 | Exp. Time: 1/160s | Aperture: 6.3 | Focal Length: 18.0mm (~27.4mm) | Copyright: 2012 CPDay
Total images: 175 | Last update: 10/19/12 2:26 PM | Go to CPDay pages | Help