Studio Apt.
(Click on any thumbnail image below to see a larger version)
Mar 29, 2004. To satisfy studio tenants' desire to be less visible from the boulevard, I installed roler shades in the window recesses. This way, we keep the casual bamboo ambiance and still provide nighttime privacy.
June 7, 2003. A panorama of the studio in its finished state. I use this image in the real estate listing.
May 30, 2003. Is this really the same place? The studio unit is ready for occupancy. The first tenants are expected in two weeks.
May 30, 2003. The studio unit bathroom was in excellent condition. Only minor repairs and cleaning were needed here.
May 30, 2003. A refinished countertop, refinished cabinets, painted back wall, brighter lighting, body work on the refrigerator and a new range have really transformed the studio unit kitchen.
May 20, 2003. Jackie is refinishing one of the steel drawers for the studio.
May 20, 2003. The old steel kitchen cabinets in the studio were badly rusted. These will need to be completely refinished.
Pre-closing. Ground level studio apartment
Pre-closing. Ground level studio apartment
Pre-closing. Ground level studio apartment