Up CPDay / Greenwich II » systems Prev Next Slideshow

Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |

 Previous image  Next image  Index page  Original Image [DSC_2798.jpg - 642kB]
DSC_2798.jpg - Kris alerted me to the need to move an electrical outlet out of the way of a new partition going into bonus room entry hall.  "Sure" I thought, "how hard can that be?"  It turns out that within the short 16-inch move to the right I ran into hot and cold PEX lines and the dryer vent duct for the adjacent laundry.  I worked everything out as shown here and the carpentry could proceed.  I added another steel nail plate to the stud to protect the electrical wires before the sheetrock was replaced.

 4 | Kris alerted me to the need to move an electrical outlet out of the way of a new partition going into bonus room entry hall. "Sure" I thought, "how hard can that be?" It turns out that within the short 16-inch move to the right I ran into hot and cold PEX lines and the dryer vent duct for the adjacent laundry. I worked everything out as shown here and the carpentry could proceed. I added another steel nail plate to the stud to protect the electrical wires before the sheetrock was replaced. | DSC_2798.jpg | 11/3/17 5:23 PM | 1600x1071px | 642kB Download Original Image
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 |
Camera: NIKON D80 | Date: 11/3/17 5:23 PM | ISO: 200 | Exp. Time: 1/60s | Aperture: 5.3 | Focal Length: 16.0mm (~24.4mm) | Copyright: © 2017 CPDay
Total images: 11 | Last update: 12/24/17 10:16 AM | Go to CPDay pages | Help