CPDay / Greenwich II
» Greenwich II Carpentry
Greenwich II carpentry work. Photos are in rough chronological order. Click any to enlarge.
Page |
1
|
2
|
21
The ceiling now seems to fit with other trim in the entry area.
10/13/17 7:24 AM
1600x1071 (395kB)
22
There is a reason why the entry door seems so heavy: It turns out to be a slab of mahogany covered up with a veneer of MDF. Huh? One must really hate the look of wood to do that. Our task is to take what we have and enhance it.
10/13/17 11:23 AM
1600x1071 (638kB)
23
Kris goes to work on the door using Jennifer's design. We're building up a panel appearence with trim moulding. Like the crown moulding, it will conform with the rest of the foyer.
10/13/17 12:46 PM
1600x1071 (508kB)
24
Back on it's hinges, we get a preview of the "dressed-up" door. Paint everywhere will help. (1)
10/13/17 3:54 PM
1071x1600 (508kB)
25
Back on it's hinges, we get a preview of the "dressed-up" door. Paint everywhere will help. (2)
10/13/17 3:55 PM
1071x1600 (543kB)
26
Kris has added the matching baseboards to the space formerly occupied by the banquette. This was a custom-made baseboard profile.
10/17/17 7:17 AM
1600x1071 (409kB)
27
Kris completed the trim carpentry to fill out the recessed bookshelves in the second floor front bedroom (formerly the nursery).
10/17/17 4:20 PM
1600x1071 (501kB)
28
Kris has been busy installing his own, custom-made, base cabinets in the "India Room." Yes, the orange color will also change
10/19/17 4:06 PM
1600x1071 (569kB)
29
New drawer slides are layed out for a count.
10/20/17 1:23 PM
1600x1071 (581kB)
30
The new cabinet baseboard is added and the drawer slides are installed.
10/22/17 9:23 AM
1600x1071 (607kB)
31
It takes a lot of tools to build a custon cabinet. Kris always picks the pricier stuff.
10/22/17 9:24 AM
1600x1071 (583kB)
32
I finished and tested the in-cabinet installation of coaxial (TV) cable, the Cat5e (phone) cable and the AC power outlet.
10/24/17 6:55 PM
1600x1071 (524kB)
33
Kris has trimmed and reattached the countertop in the "India Room."
10/27/17 6:13 AM
1600x1071 (577kB)
34
The base cabinets are nearing completion. Drawers are being ordered from a new supplier.
10/27/17 6:13 AM
1600x1071 (594kB)
35
Kris is finishing up carpentry on the drawer fronts in the India Room. The orange colors will be addressed the next day.
11/24/17 11:31 AM
1600x1071 (748kB)
Page |
1
|
2
|
Total images:
35
| Last update:
12/3/17 5:17 PM
|
Go to CPDay pages
|
Help