9
A 4" PVC port through the wall is provided for cables and/or drainage.
11/22/10 3:07 PM
10
I am extracting a pine stump with a hand-operated 'come-along' winch. This is in...
11/24/10 10:07 AM
11
More progress is made on the deck wall. The PVC port is plainly seen.
11/24/10 1:20 PM
12
Construction of the wall looks like a cut-away diagram here.
11/24/10 1:22 PM
13
This is really nice work.
11/24/10 1:23 PM
14
It takes a lot of patience to fit these stones so neatly.
11/24/10 1:24 PM
15
Most of this wall is complete.
12/4/10 12:05 PM
16
Jayne plans to plant shrubs above the wall in Spring.
12/4/10 12:05 PM